Notices in force at NAIA
CAAP publishes these as NOTAM. Most cover runway and taxiway works you would never notice from the terminal. The few that could reach your flight are first.
Might affect your flight
- B4117/26Runway 13/31 operating hours changed
- B4131/26Terminal 3 bay 102 closed
- B4132/26Terminal 3 bay 103 closed
- B4666/26Terminal 3 bay 119 closed
- B4782/26Runway 06/24 reduced operating hours
All times are Manila time.
Everything else 54
Taxiway and apron works, plus lights and equipment out of service. These keep pilots and ground crews informed and rarely change anything inside the terminal.
- Rotary rigs near Runway 06/24
- Airport charts and lighting information updated
- Obstacles near Ninoy Aquino International Airport
- Obstacle near Ninoy Aquino International Airport
- Equipment work at Ninoy Aquino International Airport
- Airport information publication updated
- Obstacles near Ninoy Aquino International Airport
- Obstacles near Ninoy Aquino International Airport
- Tower crane near Runway 13/31 operations
- Tower crane near Runway 13/31 operations
- Tower crane near Runway 13/31 operations
- Crane work in general aviation area
- Crane work in general aviation area
- Work near remote bay 71
- Tower cranes near Runway 13/31 operations
- Rotary rigs near Runway 06/24
- Work at general aviation movement area
- Work at Terminal 3 bay 110
- Soft spots on Taxiway L
- Soft spots on Taxiway H1
- Uneven pavement on Taxiway D
- Pipe laying on Taxiway C
- Taxiway stop bar lights under testing
- Soft spot on Taxiway G7
- Drone operations near Manila
- Crane in general aviation movement area
- Work near remote bay 71
- Equipment work in general aviation area
- Crane in general aviation movement area
- Hangar demolition near general aviation area
- Equipment work in general aviation area
- Uneven pavement on Taxiway C
- Pipe work near Taxiways E1 and H1
- Equipment work in general aviation area
- Hangar demolition in general aviation area
- Terminal 2 bay 49 restricted
- Taxiways J and P closed
- Taxiway F1B closed for construction
- Taxiway construction near Taxiway H3
- Taxiway construction on Taxiway K
- Tower crane near Runway 13/31
- Work at 5J Ramp 1 apron
- Construction near Terminal 3 taxiways
- Construction near Taxiways D and F1
- Construction at Terminal 3 starting point S13
- Weather station work on Taxiway H5
- Apron Control Three frequency unavailable
- Hangar construction in movement area
- Tower crane near Runway 13/31 operations
- Tower crane near Runway 13/31 operations
- Tower crane near Runway 13/31 operations
- Tower cranes near Runway 13/31 operations
- Runway 06/24 strip grading
- Helicopter departure clearance procedures