Pipe work in general movement area
- In effect
- Reference
- B6242/26
- Airport
- RPLL
Pipe laying, excavation, and manhole installation are under way in the general movement area. Pilots are advised to use caution because workers and equipment are present. This applies from Nov 26, 8:00 AM to Jan 1, 2027, 7:59 AM.
As CAAP published it
B6242/26 NOTAMN Q) RPHI/QMAXX/IV/BO/A/000/999/1431N12101E005 A) RPLL B) 2611260000 C) 2612312359 E) EXER CTN WHEN OPR GEN MOV AREA (FM COORD: 143122.45N 1210006.84E TO 143122.23N 1210009.65E) DUE WIP (PIPE LAYING, EXCAVATION, MANHOLE INSTL). RMK: PRESENCE OF MEN AND EQPT.