Excavation work near Taxiway N
- In effect
- Reference
- B5502/26
- Airport
- RPLL
Pilots are advised to use caution while taxiing on Taxiway N because excavation and drilling work is underway, with workers and equipment present. This applies from Oct 17, 8:00 AM to Dec 18, 7:59 AM.
As CAAP published it
B5502/26 NOTAMN Q) RPHI/QMXXX/IV/M/A/000/999/1431N12101E005 A) RPLL B) 2610170000 C) 2612172359 E) EXER CTN WHEN TAX TWY N (FM COORD: 143052.1N 1210059.5E TO 143044.0N 1210107.5E) DUE WIP (EXCAVATION AND DRILLING). RMK: PRESENCE OF MEN AND EQPT.