[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"notam-work-at-terminal-3-bay-108-20260828":3},{"number":4,"slug":5,"location":6,"begin_effect":7,"end_effect":8,"is_permanent":9,"friendly_title":10,"is_flagged":9,"is_active":9,"notam_type":11,"text":12,"friendly_text":13,"flag_note":14},"B4353\u002F26","work-at-terminal-3-bay-108-20260828","RPLL","2026-08-28T08:00:00+08:00","2026-09-04T17:00:00+08:00",false,"Work at Terminal 3 bay 108","N","B4353\u002F26 NOTAMN\nQ) RPHI\u002FQMKXX\u002FIV\u002FBO\u002FA\u002F000\u002F999\u002F1431N12101E005\nA) RPLL B) 2608280000 C) 2609040900\nE) EXER CTN WHEN OPR TERMINAL 3 APN PRKG BAY NR 108 DUE WIP (DEMOLITION AND EXCAVATION WORKS).\n\nRMK: PRESENCE OF MEN AND EQPT (TWO (2) BACKHOES WITH HGT APRX 9.85FT).","Pilots are advised to use caution when operating at Terminal 3 apron parking bay 108 because demolition and excavation work is underway. Workers and two backhoes about 10 feet high are present from Aug 28, 8:00 AM to Sep 4, 5:00 PM.",""]