[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"notam-taxiway-j-p3-and-h6-closed-20261127":3},{"number":4,"slug":5,"location":6,"begin_effect":7,"end_effect":8,"is_permanent":9,"friendly_title":10,"is_flagged":9,"is_active":11,"notam_type":12,"text":13,"friendly_text":14,"flag_note":15},"B6273\u002F26","taxiway-j-p3-and-h6-closed-20261127","RPLL","2026-11-27T18:00:00+08:00","2026-12-07T17:00:00+08:00",false,"Taxiway J, P3 and H6 closed",true,"N","B6273\u002F26 NOTAMN\nQ) RPHI\u002FQMXLC\u002FIV\u002FBO\u002FA\u002F000\u002F999\u002F1431N12101E005\nA) RPLL B) 2611271000 C) 2612070900\nE) PORTION OF TWY J (FM COORD: 143045.60N 1210050.16E TO \n143123.61N 1210012.71E), P3 AND H6 CLSD DUE WIP \n(CONST OF TWY AND ELECTRICAL WORKS).\n\nRMK: PRESENCE OF MEN AND EQPT.","Part of Taxiway J, along with Taxiways P3 and H6, is closed for taxiway construction and electrical work. Workers and equipment are present. This applies from Nov 27, 6:00 PM to Dec 7, 5:00 PM.",""]