[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"notam-demolition-work-at-terminal-3-bay-109-20260907":3},{"number":4,"slug":5,"location":6,"begin_effect":7,"end_effect":8,"is_permanent":9,"friendly_title":10,"is_flagged":9,"is_active":9,"notam_type":11,"text":12,"friendly_text":13,"flag_note":14},"B4508\u002F26","demolition-work-at-terminal-3-bay-109-20260907","RPLL","2026-09-07T08:00:00+08:00","2026-09-11T17:00:00+08:00",false,"Demolition work at Terminal 3 bay 109","N","B4508\u002F26 NOTAMN\nQ) RPHI\u002FQMRXX\u002FIV\u002FBO\u002FA\u002F000\u002F999\u002F1431N12101E005\nA) RPLL B) 2609070000 C) 2609110900\nE) EXER CTN WHEN OPR TERMINAL 3 APN PRKG BAY NR 109 DUE WIP\n(DEMOLITION AND EXCAVATION WORKS).\n\nRMK: PRESENCE OF MEN AND EQPT (TWO (2) BACKHOES WITH HGT APRX\n9.85FT).","Pilots are advised to use caution when operating at Terminal 3 apron parking bay 109 because demolition and excavation work is underway. Workers, equipment, and two backhoes about 10 feet high are present from Sep 7, 8:00 AM to Sep 11, 5:00 PM.",""]