[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"notam-cooling-coil-work-at-terminal-1-bay-7-20261130":3},{"number":4,"slug":5,"location":6,"begin_effect":7,"end_effect":8,"is_permanent":9,"friendly_title":10,"is_flagged":9,"is_active":11,"notam_type":12,"text":13,"friendly_text":14,"flag_note":15},"B6306\u002F26","cooling-coil-work-at-terminal-1-bay-7-20261130","RPLL","2026-11-30T21:00:00+08:00","2026-11-30T23:59:00+08:00",false,"Cooling coil work at Terminal 1 bay 7",true,"N","B6306\u002F26 NOTAMN\nQ) RPHI\u002FQMKXX\u002FIV\u002FBO\u002FA\u002F000\u002F999\u002F1431N12101E005\nA) RPLL B) 2611301300 C) 2611301559\nE) EXER CTN WHEN OPR TERMINAL 1 APN PRKG BAY NR 7 DUE WIP (HAULING OF \nCOOLING COILS).\n\nRMK: PRESENCE OF MEN AND EQPT (CRANE WITH BOOM HGT APRX 98.43FT).","Pilots are advised to use caution at Terminal 1 apron parking bay 7 while cooling coils are being moved. Workers, equipment, and a crane with a boom about 98 feet high are present from Nov 30, 9:00 PM to Nov 30, 11:59 PM.",""]